Skip to content

Maestro Plans

One agent. One document. No code touched.

A planner agent gets a fresh worktree and a goal, reads the repo until it understands it, and writes a single implementation plan. It breaks the work at real seams, gives every phase a review gate, and then argues against its own plan. It never implements.

maestro — new plan

How it plans

Read the repo. Cut at the seams. Argue with yourself.

01 —

Point it at a repo and a goal.

Maestro spawns a planner into a fresh worktree on maestro/ and the plan shows up as drafting straight away. Scope it to a project and the planner is handed that project's open tasks as context, so the plan spans the work instead of one ticket.

maestro — plans

02 —

It researches. It does not implement.

The brief allows exactly one artifact: docs/plans/.md. Nothing else in the repo is edited while a plan is being drawn. Every claim about the current state has to come from a file the planner actually read and cited, so you can check its homework.

the brief

03 —

Every phase arrives with a review gate.

Work is cut at real boundaries — modules, API surfaces, migration steps — each independently verifiable and placed in an explicit dependency order. Mechanical changes come first; the deep refactor is a separate, later, opt-in phase. Each phase names what a skeptical reviewer must check before it counts as done.

phase 3 — the query API

The loop

A plan is not finished when the agent stops typing.

The planner drafts, reports back, and waits. You read it and decide. Send it back with a steer and it revises the document and re-reports — the plan flips to drafting and comes back ready. The judgement of whether it is the right plan never leaves your side.

  1. 01 · Drafting

  2. 02 · Seams

  3. 03 · Steer

  4. 04 · Ready

plan · docs/plans/crate-library-scan-v1.md
A plan moving through its lifecycle: the planner grounds itself in the repo, breaks the work at seams, takes a steer that cuts a phase, and reports back ready.

The document

It renders like something you'd hand to the team.

The plan is markdown, so it reviews in a PR like anything else. Maestro renders the same file to a branded PDF.

A status line

The first line carries status, project, repo and branch. DRAFT reads amber, READY green, BLOCKED red.

Status: DRAFT · Repo: crate

Lead-in callouts

A paragraph opening with Why. or Non-goals. or Risk. renders as a tinted, labelled block. The beats that matter are findable.

Non-goals.

Diagrams and tables

Mermaid for architecture and sequencing, tables for decision logs, real code snippets with a language tag.

```mermaid

A worked example

This is a plan, not a screenshot of one.

Crate is a fictional sample-library organiser we planned to show the shape of the output. The document below is the whole thing — structure, seams, gates, and the section where it argues against itself.

Download the markdown ↓ Download the PDF ↓

docs/plans/crate-library-scan-v1.md · 12 KB · PDF 255 KB

DRAFT for review · Project: Crate v1 · Repo: crate

Crate — library scan and search v1

docs/plans/crate-library-scan-v1.md

Context & goal

Intended outcome

A producer points Crate at a sample folder and gets a searchable library: every audio file inventoried once, annotated with its detected BPM and musical key, and queryable offline in under 30ms. The index persists across restarts and survives the folder being moved.

Why

Search today re-walks the disk on every keystroke. On the 60k-file library we test against, src/ui/search.svelte blocks the main thread for 4–9 seconds per query — which is why the search box was quietly hidden behind a feature flag.

Non-goals

This plan does not touch the audition player (src/player/), does not add cloud sync or any network calls, and does not attempt genre classification.

Constraint

Crate is offline-first and ships as a single binary. No server, no daemon, no background indexer. Everything here runs in-process.

Current state

Grounded in the files as they stand on main:

  • ▪ src/scan/walk.ts — an async generator yielding audio paths under a root. Correct and fast (~2.1s over 60k files). Its only caller is the UI.
  • ▪ src/library/store.ts — a Map rebuilt from scratch on every mount. Never written to disk.
  • ▪ src/db/ — does not exist. There is no persistence layer yet.

Assumption

walk.ts is sound and stays. This plan treats it as the inventory source and builds around it rather than rewriting it.

Work breakdown by seam

Ordered by dependency. Each phase lands on its own and leaves the app working.

walk.tsfile pathsinventorySQLite tableprobe.tsBPM + keyFTS indexsearchqueryincremental rescan
```mermaid Scan → annotate → index → query.

Phase 1 — seam: the filesystem boundary

Persist the inventory
What changes
SQLite table keyed by path with size and mtime. Rescan compares (size, mtime) and skips unchanged files.
Files
src/db/index.ts, src/db/migrations/001_samples.sql, src/library/store.ts
Verification
cargo test scan::incremental — cold scan under 5s, warm rescan under 300ms.
Review gate
Move the fixture root and rescan. Rows must be re-pathed, not duplicated.

Phase 2 — seam: the decoder boundary

Header-only probe for BPM and key
What changes
probeHeader(path) alongside decodeFull. BPM from the file’s own tag, falling back to onset estimation. Both fields nullable.
Files
src/audio/probe.ts, src/audio/decode.ts, src/scan/annotate.ts
Verification
cargo test probe::known_bpm — tag-derived BPM exact; estimated within ±2.
Review gate
A truncated file must yield None, not a panic. Annotation must resume after a kill.

Phase 3 — seam: the search API surface

The query API
What changes
FTS5 over filename and tags, indexed range predicates on bpm and key. One function is the only read path.
Files
src/library/query.ts, src/db/migrations/003_fts.sql
Verification
cargo bench query::p95 — under 30ms for text, under 50ms with a BPM range.
Review gate
rg "from samples" src/ must return query.ts and nothing else.

Phase 4 — seam: the UI data source

Wire the UI to the index
What changes
search.svelte calls query() instead of walk(). Remove the flag. Render BPM/key columns, blank when null.
Files
src/ui/search.svelte, src/ui/flags.ts, src/ui/SampleRow.svelte
Verification
Playwright: first paint under 100ms, no main-thread block over 50ms.
Review gate
Render a scanned-but-unannotated library: blank cells, no errors, search working.

src/library/query.ts

export interface Query {
  text?: string;                    // FTS match over filename + tags
  bpm?: { min: number; max: number };
  key?: string;                     // exact, e.g. "Fmin"
  limit?: number;                   // default 200
}

export function query(q: Query): SampleMeta[];
OptionCold scan (60k)ComplexityVerdict
Synchronous annotate (Phases 1–4)~11 min est.Low — one passShip this first
Worker pool, index-first (Phase 5)~90s est.Medium — resumabilityOnly if measured pain
Skip BPM estimation, tags only~40s est.LowestFallback if estimation is a tarpit

Adversarial review

The assumption that sinks this if wrong

That BPM lives in the file’s tags for most of a real library. The fixture set is 24 files we curated and 16 are tagged — that is not evidence about a producer’s actual drive. If real libraries are mostly untagged, cold scan goes from ~11 minutes to hours and Phase 5 stops being optional. Get an actual percentage before starting Phase 2.

Riskiest seam

Phase 2. Phases 1, 3 and 4 are plumbing over a schema; Phase 2 is signal processing with no ground truth beyond fixtures we wrote ourselves. “Within ±2 BPM” is a number chosen to be passable, not one derived from what a producer would call correct.

Counter-argument to the whole plan. The problem might be entirely in search.svelte re-walking on every keystroke, not in the absence of an index. A 20-line debounce plus an in-memory cache could take 4–9s down to something acceptable and cost nothing. It is worth being explicit that the index is justified by the annotation requirement, not by the latency number.

Open questions

  1. 1 Where does $DATA_DIR point on each platform, and is it backed up? Needs a decision before Phase 1 writes the file.
  2. 2 What is the actual tag-presence rate in a real library? Blocking for Phase 2 — a measurement nobody has taken.
  3. 3 Is key a free-text tag or an enum? Libraries write Fmin, F minor, Fm and 5A. Exact match is meaningless without normalisation.

The artifact

Ready means it renders.

When the planner reports back, Maestro typesets the same markdown into a branded PDF — the status bar carries the plan's state, and each structural lead-in becomes a callout in its own colour. These are pages from the real thing.

Cover
Page 2 — status bar and callouts
Page 3 — diagram, table and code

Where it lands

The plan lives in your repo, not in a tool.

The planner commits the markdown on its own branch, so it arrives through the same PR flow as any other change. The file in the repo is the source of truth; Maestro keeps an indexed copy so the tab and the PDF are instant, and can re-read the file from the repo when someone edits it by hand.

Plans group under their project, pin to a top strip when you're living in one, and archive when they're spent.

crate — git log

Part of the suite

A plan is worth what it turns into.

Scoped to a project

Point a plan at a project and the planner gets its open tasks as context, so the plan spans the work rather than one ticket. Plans group under their project in the tab.

Maestro Project →

The orchestrator can seed one

A master agent can start a planner over the control API and read the plans back, so it can draft before it dispatches.

Maestro Orchestrator →

▪ shipping deterministic orchestration

Plan it before you play it.